May 12, 2024: Platform and Hatch

 In the upstairs bedroom, Kurt has built the platform bed.


While downstairs, the hatch door to the under-stairs storage is complete.




In the electrical cabinet, Chris has been pulling the wiring for the low-power system.





Comments

Popular posts from this blog

June 18, 2024: Supplies