June 14, 2024: Sidewalk
Time to replace the sidewalk that was damaged by equipment during construction.
It will take one full truckload -- almost 10 cubic yards.
Stein guides the chute while Nelson and the rest of the crew muck it out.
It's a cool, almost rainy day: perfect for pouring concrete.
Reynar trowels the edges.
Comments
Post a Comment