April 11, 2024: Fixtures and More
As the sun warms up, the fixtures keep coming in.
Front door.
Mud room and garage doors.
Inside the front door.
The lights and speakers of the secondary porch on the main level.
Ceiling fans on the second level.
Bobby has laid down the shower floor in the master bath. Still needs to be grouted.
Shower on the lower level.
Outside, Cactus has begun to install the railings on the Grand Deck.
Comments
Post a Comment