October 6, 2023: Insulation, Stone and Shingles

 An "all-hands" effort today on the insulation.


Continuing to spray the underlaimant.


Carrying in the fiberglass insulation.



Laying it in.


The transition between the sprayed and the fiberglass batting.





Insulation is on the outside walls (to control the temperature), but also on the inside walls (to control noise).


Meanwhile, outside the stone work continues.


While Jaime and Luis work on the roof flashing and shingles.




Comments

Popular posts from this blog

June 18, 2024: Supplies