While more windows are unloaded and installed, Bud came back to move the stockpiled dirt back to the base of the foundation, and clean up the broken sidewalk. Outside the Grand Deck. Inside the Great Room. Top floor. Remnants of the old sidewalk. Moving the dirt.
The installation of doors and windows has begun. First to go in is a sliding door to the top floor deckette. Screwing the frame to the lintel. One down; many more to go.
The plumbers are framing in for the fixtures. Meanwhile, Mario's crew is installing the decking on The Grand Deck. Points right towards the mountain BONUS: Windows are arriving.
The framing crew has spent the last couple of days putting the soffit up over the Grand Deck. Meanwhile, the porchettes on the north side have been framed atop the steel superstructure.