April 28, 2023: Roofs and Sewer Lines
Much progress: Mario and the crew are putting up the roofs, while Stein is prepping the sewer lines for first inspection.
Roof over the Great Room from below . . .
. . . and from the street.
Once framed, the crew attaches the sheeting, and then the roofing paper.
Meanwhile, down at ground level, Stein shovels gravel around the PVC piping for the lowest sewer lines.
Comments
Post a Comment