January 23, 2023: Re-Arranging
While Nelson and Mario continuing framing,
Stein, Earlen and Brede, with an assist from Bud's backhoe, have to re-arrange materials from where Alpine Lumber dropped them off.
Won't need the glulam beams for a while, so atop the dumpster is a handy spot to store on a very tight site.
Once the materials are moved, Bud starts to dig the holes for the seven piers that will support the wrap-around porch.
It's a sunny day, but the earth is frozen.
The gravel is ready to back-fill the holes.
Comments
Post a Comment