September 5, 2023: Sealing and Chasing

Image
Working their way around the Grand Deck,  Jaime and Luis seal the planking before setting the siding in place. Jaime works on the lift to wrap the sealing paper in place, then staple it down. Meanwhile, down on the lower level,  Reynar and Nelson frame out a chase for the HVAC ductwork.

September 1, 2023: More Ductwork

Image
  Work continues to install the ductwork for ventilation, and is nearing its Peak.

August 25, 2023: Ductwork

Image
  Ductwork for the air conditioning system is ready to be installed.   Fitting between the rafters and joists.

August 23, 2023: Details

Image
  Focus on details today. Next step for the stonemasons is to install wire mesh over the tarpaper. The fine mesh will bind the mortar to which the stone adheres. Outside, some of the fixtures are being installed, while inside the electricians are tying it all together. Outside, Mario's guys move to the south side for more siding.

August 22, 2023: West Side and Stonework

Image
  The siding is just about complete on the west side of the building. The masons have arrived to start the exterior stonework. First step: tarpaper to protect the wood underneath.

August 18, 2023: Pillars

Image
 Framing the pillars supporting the Grand Deck. Meanwhile, Mario's guys continue putting up the exterior siding. On the south side, all the vertical siding is on, so now moving to the horizontal siding on the lower level.

August 8, 2023: Siding

Image
  With all the balconies completed, the focus has turned to siding. Start on the west side. The pattern between the 4" boards and the 6" boards is completely random.