December 26: Steps

Image
  The new steps down from the Grand Deck are in, and already covered in snow. The day after the holiday, Nelson is busy installing the plywood around and above the fireplace.

December 18, 2023: Prepping

Image
The doors have arrived. In the kitchen, the first steps toward the island. And in the Great Room, Tanner lays down protection before beginning the finish carpentry.  

December 13, 2023: Wood Going Up and Down

Image
Outside, Jaime and Luis put up the wooden siding on the last unfinished pillar. While inside, Stein and Nelson continue to put down the wooden floor in the Great Room and master.

December 12, 2023: Update

Image
  Here are some pictures of the exterior as ot today: Chaps Way frontage Angels View Way frontage West side Alley side Inside, Nelson and Stein are working on the hardwood floors. Planing the sub-floor to make sure it is level before installing the hardwood.

December 8, 2023: Moving On

Image
As snow starts to fall, work goes on under cover. In the kitchen, Nelson and Stein have started to lay down the flooring. The stonemasons have moved the protective sheeting to the garage side . . . leaving the stonework complete where they've been.  

December 6, 2023: More Siding

Image
  On a bluebird day, Luis and Jaime start the siding on the garage pillars.   Standard-sized pieces are cut to custom size. The widths of the pieces vary, just like on the main siding on the house. Meanwhile, under the plastic sheet, the stonework continues.

December 4, 2023: After the Storm

Image
 30" of fresh, heavy, wet snow gives a great base for the year. But the work goes on. Joel keeps working to get the heating manifold completed. Friday before the storm. Monday after the storm. Outside, Jaime and Luis put the finishing touches on the standing seam roof over the front door. Upstairs, Stein and Nelson have started installing the wooden flooring on the top floor.